DISTRIBUTOR EDI CONNECTION

Connect to HD Supply EDI with EDIXT

HD Supply Electronic Data Interchange (EDI) distributor profile built around purchase order, purchase order acknowledgement, advance ship notice, and invoice, transport design, and downstream handoff into ERP, Warehouse management, and Finance.

This page uses the current EDIXT rollout profile for HD Supply, covering X12 850, 855, 856, 810 for rollout planning, validation, and downstream handoff before partner-specific exceptions are added.

Distributor Partner layer
US Coverage
5 flows Message scope
Distributor the United States X12 850, 855, 856, 810
Partner overview

How to use this partner profile

HD Supply is currently mapped as a distributor partner in the United States. The current EDIXT Electronic Data Interchange (EDI) profile for this route is built around purchase order, purchase order acknowledgement, advance ship notice, and invoice, because those messages usually define the first operational checkpoints teams need to stabilise.

Use this profile to plan transport over AS2, SFTP, and API, validation checkpoints, and downstream handoff into ERP, Warehouse management, Finance, and Reporting while partner-specific identifiers, exceptions, and timing rules are being confirmed.

EDIXT is currently using the distributor rollout profile for HD Supply, based on purchase order, purchase order acknowledgement, advance ship notice, and invoice. Confirm the final document mix, identifiers, transport rules, and timing windows during onboarding.
EDI capabilities

Transactions and message scope

Below is the current Electronic Data Interchange (EDI) document profile used to plan connectivity for HD Supply, based on the document mix teams usually need first in this distributor workflow.

850

Purchase order

Core order instructions that trigger validation, routing, and downstream fulfilment.

855

Purchase order acknowledgement

Commercial confirmation back to the buyer before the order moves downstream.

856

Advance ship notice

Shipment structure and carton detail passed into warehouse, carrier, and customer systems.

810

Invoice

Structured billing data passed to finance and reconciliation workflows.

846

Inventory advice

Inventory position or availability signals synced into planning and commerce systems.

Onboarding flow

Typical rollout sequence for HD Supply

A typical Electronic Data Interchange (EDI) rollout starts by teams agreeing how to agree the distributor document mix and ends with the controls needed to watch account-level exceptions.

1

Agree the distributor document mix

Define the order, stock, shipment, and invoice messages needed for this trading relationship.

2

Normalize product and account references

Align SKUs, pack sizes, branch references, and account codes before go-live.

3

Route operationally clean data

Push validated messages into warehouse, finance, and customer-facing systems.

4

Watch account-level exceptions

Surface branch, delivery, and billing mismatches before they slow down operations.

Validation focus

Common issues teams need to catch early

The main Electronic Data Interchange (EDI) risk areas for HD Supply usually show up around branch and location mismatches and pack-size and unit conversions.

FAQ

Questions teams often ask before they connect HD Supply

These answers cover the document mix, transport methods, validation checks, and downstream handoff patterns currently used to plan connectivity for HD Supply.

What transaction scope is usually relevant for HD Supply?

HD Supply is currently profiled around purchase order, purchase order acknowledgement, and advance ship notice, which gives teams the practical document scope to map, validate, acknowledge, and route into live operations.

Is this based on exact partner coverage or a common rollout pattern?

This profile is based on the current EDIXT rollout pattern for HD Supply, using the distributor message mix and downstream handoff patterns teams most often need first.

Which systems usually need to receive HD Supply data?

For this profile, the downstream handoff usually touches ERP, Warehouse management, Finance, and Reporting, so the integration design needs to keep both partner rules and internal system constraints in view.

Next step

Turn this partner profile into a live rollout plan

Use this profile to confirm the document scope, transport rules, validation ownership, and downstream routing needed for HD Supply, then move the rollout into mapping, testing, and cutover.

Document scope X12 850, 855, 856, 810
Transport AS2 / SFTP / API
Landing systems ERP / Warehouse management / Finance